Octal PCB Tube Socket, Long Lead

An 8-pin octal PCB socket with long legs, made to fit Fender PCB amps where the board sits further below the chassis than a standard PCB socket allows. Fits octal (8-pin) tubes such as the 6L6, 5881, 6V6, EL34, KT66, KT77, KT88, 6550, 6SN7, 6SL7, 5AR4/GZ34, 5U4GB and 5Y3.

Specifications

  • Base: octal 8-pin (K8A)
  • Mounting: PCB mount, long leads
  • Style: suits Fender PCB amps

Which tubes fit? See the Octal 8-pin section of our Tube Socket Guide for the full list of tubes this socket suits, and remember that the same socket does not mean the same pinout.

Helpful Evatco Guides

SKU OctSockPCBlonglead
Brand Generic
Shipping Weight 0.0200kg
Shipping Width 0.050m
Shipping Height 0.050m
Shipping Length 0.050m
Shipping Cubic 0.000125000m3
Unit Of Measure ea

Be The First To Review This Product!

Help other Evatco users shop smarter by writing reviews for products you have purchased.

Write a product review

--/.row-->